Polyus Arsenal LLC is a Kazakhstani specialist contractor that has worked in underground mining since 2011: development and drifting, and rehabilitation of ground support in underground workings at operating mines.

2011year founded
200,000+m³ of capital mine development
2015–2026contracts with mines
01

Licences for the full mining production cycle

Sheet 01 · Documents

The company's competences are not limited to capital mine development. General state licence No. 12017604, dated 5 December 2012, grants the right to the full cycle of mining production — from design and opening up of deposits to extraction and mine closure:

01.1Opening up and development of solid mineral deposits by open-pit and underground methods
01.2Extraction of solid minerals (excluding commonly occurring minerals)
01.3Technological operations at deposits
01.4Blasting operations for the extraction of minerals
01.5Design (technological) and operation of mining facilities
01.6Decommissioning works for the closure of mines and pits
01.7Preparation of designs and technical regulations for the development of deposits
01.8Design of solid mineral extraction
Hard hat and cap lamp · mine planHard hat and cap lamp · mine plan
ExplosivesLicence No. 19024188 (first issued 24 December 2013) — acquisition and storage of explosives and of articles containing them, for the company's own production needs
CertificationsAll industrial safety certifications for work at hazardous production facilities
02

Certified crews, accepted volumes

Sheet 02 · Personnel
Development crew · operating mineDevelopment crew · operating mine
Qualification

Certified specialists

Development miners, blasters, ground support installers, LHD operators, surveyors and mechanics — every engineer and worker holds specialist training, certificates and regular refresher qualification.

Audit

Internal control

Our own system of control over occupational health and safety and over the quality of the work performed: every linear metre driven is handed over to the client's acceptance commission.

03

Our own base and accommodation block

Sheet 03 · Infrastructure

Continuity of work is ensured by autonomous infrastructure: a production base with a mechanical workshop, a welding bay and stores, and a residential block with a canteen for the rotational crews. Our people live next to the production site.

BaseMechanical workshop, welding bay, materials stores
AccommodationResidential block with catering for rotational personnel
MaintenanceEquipment serviced on site, 24/7
Company office · 73A Glinki St., SemeyCompany office · 73A Glinki St., Semey
04

Awards and letters of appreciation from clients

Sheet 04 · Recognition

Official references and letters of appreciation — from the open pits of Kazakhaltyn to the underground levels of Vostoktsvetmet. And the recognition that matters most: clients who come back with new contracts.

Orlovsky Complex · since 2015

Vostoktsvetmet LLP

“Has proved itself an organised and mobile company capable of solving the most complex tasks. Extensive experience in applying modern methods of driving and re-supporting underground workings with the use of foaming and bonding resins in the difficult mining and geological conditions of the Orlovskoye deposit”

reference from the chairman of the management board, 2024

Letter of appreciation

Orlovsky Production Complex

“The work is carried out in difficult conditions, but thanks to the professionalism and competence of the personnel there are no complaints as to the quality of the work”

director of the Orlovsky Complex, Vostoktsvetmet LLP

Suzdal mine

FIC Alel JSC

“Well-coordinated and competent work by specialists at every level, and a serious approach to compliance with industrial safety and occupational health and safety. On the results of the work performed — a reliable partner”

driving of horizontal and vertical workings, underground drilling

Open pit · 2012

Dank LLP · Kazakhmys

“The work was performed on schedule, and no complaints as to quality were received. Over the period of the work not a single breach of safety rules or occupational health and safety was recorded”

excavation and haulage of rock mass, exploration works project

Akzhal · 2012

Gornyak Prospectors' Artel · Kazakhaltyn JSC

“Performed the work on schedule, without any breach of the obligations undertaken. Proved to be a responsible and honourable partner”

winner of the tender for excavation and haulage of rock mass

Vesenne-Aralchinskoye · 2014

Kazakhstan Kind Mining Investment Company

“High qualification of the personnel, work performed with the use of new technologies, compliance with all industrial safety and occupational health and safety standards. We recommend them as a reliable and responsible partner”

preparation of rock mass by blasting

Sheet 06 · Contact

Let's meet at your site

Sheet 06 · Request

Send a request

We call back during business hours to clarify the details — usually the same day.

Subject
or call +7 (7222) 361-421
About the company — Polyus Arsenal